Sustainability by up to date Technology
According to the environmental management several steps had been taken during the last few years:
- Replacement and updating of the control board for all galvanic electrolytes and the waste water treatment.
- Reorganization of t he heat flow in the heating system leads to a reduction of the inlet temperature as a premise for the installation of a block heat and power plant
- Replacement of the compressor
- Installation of a BHKW in cooperation with Stadtwerke Solingen
- Conversion of the hall light’s to energy saving LED-technique
In the works:
- Heat recovery from the exhaust fan
Planned steps within the environmental management:
- Isolation of the roof area
- Installing of a block heat and power plant in the near future