Sustainability by up to date Technology

According to the environmental management several steps had been taken during the last few years:

metal_7

  • Replacement and updating of the control board for all galvanic electrolytes and the waste water treatment.
  • Reorganization of t he heat flow in the heating system leads to a reduction of the inlet temperature as a premise for the installation of a block heat and power plant
  • Replacement of the compressor
  • Installation of a BHKW in cooperation with Stadtwerke Solingen
  • Conversion of the hall light’s to energy saving LED-technique

In the works:

  • Heat recovery from the exhaust fan

Planned steps within the environmental management:

  • Isolation of the roof area
  • Installing of a block heat and power plant in the near future